Additions & ADUs in Austin

An addition is decided by the lot before it is decided by the plan. Impervious cover, setbacks, height limits, tree protection and, in some neighborhoods, historic review determine what is actually buildable. We settle that first, then design to it.

Pricing
Fixed price after design
Scheduling
Planned for your house
Warranty
12-month labor workmanship
Modern rear home addition with floor-to-ceiling glazing opening onto a shaded Austin backyard

What is included.

  • Feasibility review of the lot: coverage, setbacks, height, trees and drainage, before design
  • Architectural plans and structural engineering
  • Foundation, framing, roofing, siding, windows and doors
  • Electrical, plumbing and HVAC extension or new systems, by Texas-licensed trade partners
  • Full interior finish of the new space, and tie-in detailing so it reads as part of the house
  • Permitting with the relevant city, plus historic or arborist review where it applies
  • 12-month workmanship warranty on labor

What is not.

  • Land purchase, survey fees and City impact fees, which are paid directly by the owner
  • Landscaping and fencing beyond restoring what construction disturbs
  • Furnishing or appliance packages
  • Renovation of the existing house, unless you add it to scope

We publish the exclusions because they are where surprises live. Anything on this list that you want included becomes part of the scope and part of the fixed price.

Where the number comes from

What pushes the cost up, and what brings it down.

Pushes it up

  • Second stories, which require structural reinforcement of everything below
  • Working inside a heritage tree's critical root zone, which changes the foundation approach
  • A detached ADU needing its own utility service and connections
  • Sloped lots requiring retaining walls or deep foundations
  • Matching historic exterior details on a contributing property

Brings it down

  • A single-story rear addition on a flat, unconstrained lot
  • Keeping the addition on the same side as existing plumbing and electrical
  • Converting an existing garage or outbuilding rather than building new
  • A simple roofline that ties in cleanly to the existing structure

How it goes

The same five steps, every project.

Full process
  1. 01

    Consultation

  2. 02

    Design & Selections

  3. 03

    Fixed-Price Proposal

  4. 04

    Permitting & Pre-Construction

  5. 05

    Construction

Questions

Additions & ADUs questions we get most.

Can I build an ADU on my lot?

It depends on lot size, coverage, setbacks and your jurisdiction's rules. We check feasibility at consultation, before you pay anyone to design something that cannot be permitted.

Will the addition look added on?

Not if it is detailed properly. Matching siding profile, window proportion, roof pitch and trim is most of the work, and in Hyde Park and other historic districts it is also a review requirement.

How does permitting work for an addition?

It involves more review than an interior remodel, and more again if trees, historic status or a separate city are involved. The review calendar belongs to the reviewing authority rather than to us, and we report where your submittal sits every week.

All frequently asked questions